GEG Master Plan Project

Master Plan For Sustainable Development Of

Gol-e-Gohar Mine and Industry Complex
 

On the 8th of Aban 1391(29/10/2012) the results of the final Master Plan Report was presented to a group of 60 people comprising of the managing directors of the companies of the Complex as well as the managers , experts and consultants of the expansion projects.

Gol e Gohar Mining and Industrial Company has chosen VADATEC Consortium comprising of the Iranian Company Varia Tarh Pars and the Italian Companies ECOMIN and DARYATEC with the leadership of Varia Tarh Pars as the Consulting Body for the Master Plan Studies of the Gol e Gohar Mining and Industrial Complex in Sirjan.

A group of professors from the Environmental Faculty of Tehran University for the environmental , architectural and landscaping studies , Amoodrah Company for roads and railways and the Academic Group from the Center for the Forestry and Pastures Research have also collaborated with VADATEC Consortium.

For realizing the aims and performing the studies, the Master Plan has been divided into the following disciplines:


1. The project for the development and plot plan of Gol e Gohar Mining and Industrial Complex.
2. The projects for expansion of the mines , processing lines, pelletizing and management of tailings.
3. Direct reduction and steel making lines and production of flat and long products.
4. The expansion infrastructure projects for water, electricity, gas, surface water, traffic, roads and railways and transport of the materials in the Complex.
5. The study of environmental compound effects, health and safety of the Complex
6. The project for green areas and the choice of the plant species suitable for the Zone.
7. The plot plans and architectural studies for the Complex.
8. The supporting industries for the Zone.
9. Financial planning of the expansion projects for the Zone.

 

The area for the Master Plan Studies is about 19,000 hectars and is limited to:
Sirjan -Shiraz road in the north , Gol e Gohar Railway station in the east, Bahram Goor Protected Area in the west and a range of mountains in the south.
 

In the said meeting it was declared that among the major points that have been reflected in the reports and presented to Gol e Gohar Mining and Industrial Company are the following:
 

1. Grand strategy of the expansion projects for the Gol e Gohar Mining and Industrial Complex.
2. Grand sectional plan in 21 working sections.
3. Simulation of the mines reserves lives versus concentration lines needs for ROM and the requirements for energy, water and other fluids for the expansion projects.
4. Coordination of interdependent matters and updating the mines exploitation methods, processing lines, steel producing lines including direct reduction, electric arc furnace , continuous casting, rolling of flat and long products.
5. Guidelines for planning and engineering of simultaneous production from open pit and underground methods from Mine No 3.
6. Project for supply of ROM, concentrate and pellets by conveyor belt between the industrial units and supply of ROM , concentrate and pellets from outside the Complex if necessary.
7. Study of the traffic in the Complex and the project for the connecting roads from outside and between the industrial units for heavy and light vehicles.
8. The project for the rail terminal and the railway connections between the terminal and the industrial units.
9. Management and safety of the present tailings ponds and the layout for the future tailings depot.
10. The project for recovering water from the tailings ponds and dry tailings depot in the predetermined spots.
11. The scenarios for supply of energy by considering the limitations in the supply of electricity, the transmission lines, the short circuit capacity and the time schedule for expansion of the power plants and their connection to the national network.
12. Evaluation and summing up of the consumption and the quality of the water and the industrial and human sewage of the industrial units.
13. Evaluation and summing up of the gas consumption and the distribution of the gas pressure reducing stations for the industrial units.
14. Preparation of the plot plan and layout for the Complex
15. Preparation of the landscape for the Complex.
16. Designing of the corridors allocated for the distribution of electricity, gas, fluids and tailings.
17. The project for protection of the mines, and industrial areas form the running surface water.
18. The project for collecting the surface water and conducting it to the predetermined ponds.
19. The general design for the shunting yard of the freight wagons and the railway lines for the expansion projects.
20. Defining the cultivation patterns and the plant species for the Complex.
21. Designing of the green areas within the general lay out of the Complex.
22. Guidelines for evaluating the combined effects of the environmental problems for the whole Complex.
23. Guidelines for industrial health and safety, emergency and fire fighting for the whole Complex.
24. The project for the supporting and ancillary industries for the Complex.
25. Financial planning for the Expansion Projects.