Client :
ChadorMalu Mining and Industrial Company (CMIC)
Site Location: Ardakan, Yazd
Capacity : 1,550,000 T/Y Hot and Cold DRI
( 1,700,000 T/Y with Oxygen injection)
Contractor : Consortium of Persian Mines &
Industries Development Co.
(“Pamidco”) and CPG Co.
Consultant : ATIECO
Status: in operation
Project Description: Chadormalu Mining and
Industrial Company (CMIC) intends to establish a
DR plant to produce 1.55 million metric tons of
hot DRI (HDRI) and cold DRI (CDRI) per year,
which the capacity can be increased to 1.7
million metric tons per year with Oxygen. This
project also includes infrastructure, Material
Handling, Hot Product Handling system to steel
making plant and Water cooling system.
Varia Tarh Pars
Scope of Work :
Scope of work of this company is Construction
license services, Engineering , Procurement
services, Overall supervision on construction,
Commissioning management services
and Performance test of
the following systems.
• Oxide material handling
system
• Direct reduction plant and auxiliary units
• Product hot charge system
• Cold product handling system
• Water cooling system
So many latest technologies
being used in this plant such
as:
• Hot DRI charging to EAF
with conveyor
• Air coolers system for water saving
• Top gas fuel heating up for energy saving
• Soft starters for energy saving and equipment
protection
• Motion control for hydraulic system for better
burden feeder movement
• Improved heat recovery
system for energy saving